Customization: | Available |
---|---|
After-sales Service: | Sales Services |
Warranty: | 12 Months |
Still deciding? Get samples of US$ 15000/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
API Solid Control Oil Well Drilling Tool Jet Mud Mixer 15KW
Solid control oil well drilling tool Jet Mud Mixer and spare parts
oil well drilling tool Jet Mud Mixer
Product Description
Features:
The drilling fluid flow into the jet pump with certain pressure,in the jet pump fluid spouts out from jet nozzle first, then flows into shear pipe through mixing chamber. Materials will be added from hopper to mixing hopper, and move into shear pipe with the flow. During this process, they are dispersed and mixed. The mixture will enter into drilling fluid tank when flows out of the shear pipe.
The shear pipe is hollow and it can expand gradually based on certain curved surface. It is mainly used to enlarge shearing force inside the pipe to disperse the material further and increase the mixture pressure head, this will make it easy to enter into circulating tank.
Bernoulli effect is adopted in shear pipe which is flow rate is rapid with low pressure, and slow with high pressure. Pressure is low in the chamber when fluid spouts out in high speed from the jet nozzle; when fluid enters into the shear pipe, its section is enlarged and flow rate decreased so the pressure rises.
API Solid Control Oil Well Drilling Tool Jet Mud Mixer 15KW
Products Show
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |