After-sales Service: | on Site on Line |
---|---|
Warranty: | 12 Months |
Manufacturing Process: | Forging |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
China Oil well drilling rig hydraulic power unit
Hydraulic Power Unit Station Electric Hydraulic Power Pack is a hydraulic component that supplies pressurized liquid to a hydraulic transmission and is a type of pump. Its function is to convert the mechanical energy of a power machine (such as an electric motor and an internal combustion engine) into the pressure energy of a liquid.
Modelrated pressurerated flow
Tank capacity
Model | rated pressure | rated flow |
Tank capacity (L) |
Power (KW) |
Weight | Size | ||
high pressure | low pressure | high pressure | low pressure | KG | L*B*H | |||
DBD0.7L | 63 | / | 0.7 | / | 4 | 0.75 | 22 | 300*200*400 |
63 | / | 0.7 | / | 4.5 | 0.75 | 23.3 | 350*230*450 | |
DBS0.6/2L | 63 | 2 | 0.6 | 2 | 4.5 | 0.75 | 24 | 350*230*450 |
DYB-1A | 63 | 6.3 | 0.6 | 2.4 | 16 | 0.75 | 41.5 | 390*300*520 |
DYB-1B(S) | 80 | 6.3 | 0.6 | 2.4 | 16 | 0.75 | 49 | 390*300*520 |
DYB0.8M | 80(100) | / | 0.8 | / | 16 | 1.5 | 49 | 390*300*520 |
DSD0.8M/4B | 80 | 2.5 | 0.8 | 4 | 20 | 1.5 | 63 | 450*350*600 |
DSD0.8M/6B | 80 | 2.5 | 0.8 | 6 | 36 | 1.5 | 80 | 450*350*600 |
DSD1.6M/6B | 80 | 2.5 | 1.6 | 6 | 36 | 2.2 | 80 | 450*410*715 |
DSD2.0M/6B | 80 | 2.5 | 2 | 6 | 36 | 2.2 | 80 | 450*410*715 |
LSJ4*400 | 40 | / | 4 | / | 40 | 3 | 91 | 500*400*670 |
DSQ6/50H | 32 | 2.5 | 6 | 50 | 160 | 4 | 195 | 800*540*1025 |
DSQ6H/P4B | 32 | 2.5 | 6 | 14 | 60 | 2.2 | 85 | 850*550*500 |
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |
Suppliers with verified business licenses