Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Gardner Denver BOMCO Henghua PA-7 mud pump spare parts F1300 F1600
The valve assembly consists of the valve and valve seat. Valve and valve seat are made of one-piece premium forged alloy steel, and follow the manufacturing process specification directly to assure the good finish, accurate size. With the advanced heat treatment it features high ductility, high strength and the surface hardness is up to HRC58.
The seal of valve body is made of polyurethane or synthetic rubber and has high wear resistance and long service life. It can be removed and replaced easily.
Name of Parts |
Service Life (hours) |
Valve |
>600 |
Valve Seats |
>600 |
Valve Nut |
>1800 |
Valve Rubber |
>300 |
Valve Spring |
>600 |
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |