Customization: | Available |
---|---|
After-sales Service: | on Site on Line |
Warranty: | 12 Months |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
SEACO brand, API 5L Carbon steel SSAW Steel pipe for pipeline
Standard |
API 5L,ASTMA139,ASTMA252, DIN, EN10217/10219/10224,BS,JIS |
Grade |
ASTMA53 Gr.B;API5L Gr.B,X42~X80; ASTMA252 Gr.2,Gr.3; ST37,ST42,ST52;EN10025 S235JR,S275JR,S355JR etc. |
Usage: |
for construciton ,green house, bridge , fluid transmission and so on |
Out Diameter |
219mm-2540mm |
Tolerence |
-/+3% |
W.T |
6mm-15mm |
Thickness tolerence: |
-/+3% |
Length: |
5.8m ,6m,11.8m ,12m or acc to requirement |
Technique: |
SSAW |
Place of origin: |
China |
Productivity: |
10000 MT/ month |
Main market: |
asia, africa ,middle east ,south american, USA |
Certification: |
API,ISO ,BV ,SGS, |
Surface treatment: |
with or without varnish/FBE/3PE/3PP coating
|
Ends: |
1) deburred |
|
2) plain |
|
3) straight |
|
4) the outside welded line is sooth |
External bead: |
removed |
Internal bead: |
not removed |
Package |
1) in bulk |
|
2) in bundle |
|
3)in plastic wrap |
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |