• Oil Field Drilling Hydrocyclone for Oil Well Desander
  • Oil Field Drilling Hydrocyclone for Oil Well Desander
  • Oil Field Drilling Hydrocyclone for Oil Well Desander
  • Oil Field Drilling Hydrocyclone for Oil Well Desander
  • Oil Field Drilling Hydrocyclone for Oil Well Desander
  • Oil Field Drilling Hydrocyclone for Oil Well Desander

Oil Field Drilling Hydrocyclone for Oil Well Desander

After-sales Service: 12 Months
Warranty: 12 Months
Certification: ISO 9001:2000
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Oil Field Drilling Hydrocyclone for Oil Well Desander pictures & photos
Oil Field Drilling Hydrocyclone for Oil Well Desander
US $500 / Set
Min. Order: 1 Set
Gold Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Detailed Photos
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
drilling Hydrocyclone
Standard
AISI, ASME
Material
Carbon Steel
Type
Gravity Separator
Voltage
N/a
Weight
1t
Transport Package
Standard Export Packing
Trademark
SEACO
Origin
Shandong China
HS Code
84314310

Packaging & Delivery

Package Size
45.00cm * 20.00cm * 15.00cm
Package Gross Weight
20.000kg

Product Description

                                               

Oil field drilling Hydrocyclone for Oil Well Desander
Product Description

Hydrocyclone -Product advantages
 

1.Simple structure; light and nimble; no moving part

2.Low maintenance charge; easy to attach and detach; save floor space; low construction expense

3.Large processing capacity

4.The classification particle size can reach 10μm


The desander can be widely applied in the triple-process of the drilling fluid and when it is used efficiently, the desanders can effectively clear the solid-phase granules with diameter of more than 30 microns in the drilling fluid. It is one indispensable device for stabilizing and adjusting the drilling fluid technical parameters, suitable for those drillers as ZJ70, ZJ50 and ZJ40. And it can be used together with the sealed circulatory system of the drilling fluid.

Detailed Photos
Oil Field Drilling Hydrocyclone for Oil Well Desander
Oil Field Drilling Hydrocyclone for Oil Well Desander
Oil Field Drilling Hydrocyclone for Oil Well Desander
Oil Field Drilling Hydrocyclone for Oil Well Desander
Oil Field Drilling Hydrocyclone for Oil Well Desander

 

 


Oil Field Drilling Hydrocyclone for Oil Well Desander

 

Oil Field Drilling Hydrocyclone for Oil Well Desander
Company Profile

Oil Field Drilling Hydrocyclone for Oil Well Desander

FAQ
FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now