Media: | Water |
---|---|
Temperature: | Low Temperature |
Type: | Direct-acting |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
1.Description of Product
Size : 2"-12"
Pressure : 200lb-800LB 500-10000psi maximum
Medium : Water, Air, Gas, etc
Temperature : -29~+450 C
Material: Cast iron, Carbon steel, Stainless steel
Design:ASME B16.34;
Inspection&Testing: API 598/API 6D;API 6A
Face to Face:ASME B16.10;
Seal: rubber seal and metal seal as per customer request
Connection: flange and thread type
Stem: rising type and non rising type both avaliable ,
Size from 2inch to 20 inch
standard: API standard ,ASME
certificate: CE and API certificate is avaliable ,also 3.1 certificate will together with delivery
Before place order we will prepare the gate valve sizes and dimensions also detail drawing for your confirm.
alway supply best quality and service with shortest delivery time for all our costumers.
304/316 Stainless Steel CF8/CF8M/CF3M non Rising Trim Gate Valve
2.Application of product
Our goods are widely used on fire fighting, water,electric plant , marine and oil&gas.
3,Packing: with woodern box in exporting package or as per customer request.
4,warranty:12 months from delivery time.
304/316 Stainless Steel CF8/CF8M/CF3M non Rising Trim Gate Valve
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |
Suppliers with verified business licenses