Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′

Product Details
Customization: Available
Media: Oil
Temperature: High Temperature
Still deciding? Get samples of $ !
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
  • Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
  • Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
  • Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
  • Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
  • Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
MG RG HGG API Casing Tubing Center Latch Elevators
Type
Tri-through
Material
High Manganese Steel,Tungsten Carbide
Connection Form
Thread
Pressure
High Temperature
Actuator
Manual
Seal Surface
Wedge Gate Valve
Thread Position of Valve Rod
Inside Gate Valve
Usage
Drain, Temperature Control
Standard
JIS
Application
Industrial Usage, Household Usage
Grade
35CrMo AISI 4140 G105
Connection
Male Female
Tubing Coupling Size
1.05" to 4-1/2"
Casing Coupling Size
4-1/2" to 20′′
Name
Mg Rg Hgg API Casing Tubing Center Latch Elevators
Model
Mg Rg Hgg API Casing Tubing Center Latch Elevators
Transport Package
Standard Export Package
Specification
2 3/8 2 7/8 3 1/2
Trademark
SEACO
Origin
Shandon China
HS Code
84314310
Production Capacity
100t

Packaging & Delivery

Package Size
45.00cm * 20.00cm * 20.00cm
Package Gross Weight
200.000kg

Product Description

Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2"
MG RG HGG API Casing Tubing Center Latch Elevators for Top Drive 3 1/2"
API Standard casing Elevators for oilfield

 

Product Description

Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2"
MG RG HGG API Casing Tubing Center Latch Elevators for Top Drive 3 1/2"

 

The elevators are hoisting tools for handling 90 shoulder drill pipe, casing, tubing and drill collar in oilfield.

The elevators is according to API SPEC 8A standard.

Material: carbon steel, stainless steel 
Size:  tubing coupling from 1.05" to 4-1/2",Casing coupling from 4-1/2"to 20"
Connection: Male, female 
Coupling Type:, NUE, EUE (tubing coupling), STC,LC,BTC(casing coupling).
Head: thread

We also supply permium thread products by customer's request

Grade: J55,K55,N80,L80,P110 
Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2"
MG RG HGG API Casing Tubing Center Latch Elevators for Top Drive 3 1/2"

 

Tubing Coupling Specification

Descriptions and size

Type of Therad

O.D*L
(mm)

Weight
(kg)

Tubing Coupling
 

1.050

NUE

33.35*80.96

0.23

1.050

EUE

42.16*82.55

0.38

1.315

NUE

42.16*82.55

0.38

1.315

EUE

48.26*88.90

0.57

1.660

NUE

52.17*88.90

0.59

1.660

EUE

58.88*95.25

0.68

1.900

NUE

55.88*95.25

0.56

1.900

EUE

63.50*98.42

0.84

2-3/8"

NUE

73.02*107.95

1.28

2-3/8"

EUE

77.80*132.82

1.55

2-7/8"

NUE

88.90*130.18

2.34

2-7/8"

EUE

93.17*133.35

2.40

3-1/2"

NUE

107.95*142.88

3.71

3-1/2"

EUE

114.30*146.05

4.10

4"

NUE

120.65*146.05

4.35

4"

EUE

127.00*152.40

4.82

4-1/2"

NUE

132.08*155.58

4.89

4-1/2"

EUE

141.30*158.75

6.05


 Casing Coupling Specification

Casing Coupling












 

4-1/2"

STC

127.00*158.75

5.23

4-1/2"

LTC

127.00*177.80

4.15

4-1/2"

BTC

127.00*225.42

4.55

5"

STC

141.30*165.10

4.66

5"

LTC

141.30*196.85

5.75

5"

BTC

141.30*231.78

5.85

5-1/2"

STC

153.67*171.45

5.23

5-1/2"

LTC

153.67*203.20

6.42

5-1/2"

BTC

153.67*234.95

6.36

6-5/8"

STC

187.71*184.15

9.12

6-5/8"

LTC

187.71*222.25

11.34

6-5/8"

BTC

187.71*244.48

11.01

7"

STC

194.46*184.15

8.39

7"

LTC

194.46*228.60

10.83

7"

BTC

194.46*254.00

10.54

7-5/8"

STC

215.90*190.50

12.30

7-5/8"

LTC

215.90*234.95

15.63

7-5/8"

BTC

215.90*263.52

15.82

8-5/8"

STC

244.48*196.85

16.23

8-5/8"

LTC

244.48*254.00

21.67

8-5/8"

BTC

244.48*269.88

20.86

9-5/8"

STC

269.88*196.85

18.03

9-5/8"

LTC

269.88*266.70

25.45

9-5/8"

BTC

269.88*269.88

23.16

10-3/4"

STC

298.45*203.20

20.78

10-3/4"

BTC

298.45*269.88

25.74

11-3/4'

STC

323.85*203.20

22.64

11-3/4'

BTC

323.85*269.88

28.03

13-3/8"

STC

365.12*203.20

25.66

13-3/8"

BTC

365.12*269.88

31.77

16"

STC

431.80*228.6

34.91

16"

BTC

431.80*269.88

40.28

18-5/8"

STC

508.00*228.60

51.01

18-5/8"

BTC

508.00*269.88

62.68

20"

STC

533.40*228.6

43.42

20"

LTC

533.4*292.10

57.04

20"

BTC

533.40*269.88

50.10

 

Detailed Photos

Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′


Mg Rg Hgg Casing Tubing Center Latch Elevator 3 1/2′′
FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now