Certification: | ISO 9001:2000, ISO 9001:2008 |
---|---|
Power Source: | Hydraulic |
Operation Pressure: | Atmospheric Pressure |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
High quality downhole Cementing Tool casing pipe float shoe and float collar
Cementing tool float shoe
Float shoe description:
Oil well drilling and well completion, it's longevity and safe operation depends greatly on a good, complete cementing. Deviated or fully horizontal casings rely on a proper standoff for a complete cementing which comes from using Casing Centralizers!
Straight or Spiral Blade Casing Centralizers offer that insurance as they overcome the gravitational and axial forces of a casing.
13 3/8" High quality downhole Cementing Tool casing pipe float shoe and float collar
Float shoe specifications:
Specification(in) |
O.D.(mm) |
Total length(mm) |
I.D. (mm) |
Min. Dia.(mm) |
Conn Type |
Affordable strength of back-pressure(Mpa) |
|
Float Collar |
5 |
141.30 |
500 |
110 |
50 |
5 BCSG |
35 |
5 1/2 |
153.67 |
530 |
112 |
55 |
5 1/2BCSG |
35 |
|
7 |
194.46 |
586 |
162.5 |
77 |
7 BCSG |
35 |
|
9 5/8 |
270 |
720 |
225 |
77 |
9 5/8 BCSG |
35 |
|
13 3/8 |
365 |
720 |
319 |
77 |
133/8 BCSG |
35 |
|
20 |
533.4 |
720 |
475 |
77 |
20 BCSG |
35 |
|
Float Shoe |
5 |
140.30 |
495 |
110 |
50 |
5 BCSG |
35 |
5 1/2 |
153.67 |
514 |
122 |
55 |
5 1/2 BCSG |
35 |
|
7 |
194.46 |
533 |
162.5 |
77 |
7 BCSG |
35 |
|
9 5/8 |
269.88 |
550 |
225 |
77 |
9 5/8 BCSG |
35 |
|
13 3/8 |
339.7 |
550 |
319 |
77 |
133/8 BCSG |
35 |
|
20 |
534 |
652 |
475 |
77 |
20 BCSG |
35 |
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |
Suppliers with verified business licenses