Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs

Product Details
Customization: Available
After-sales Service: on Site on Line
Warranty: 12 Months
Still deciding? Get samples of US$ 1/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs
  • Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs
  • Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs
  • Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs
  • Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs
  • Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
ZP495 ZP175 ZP205 ZP275
Manufacturing Process
Forging
Surface Treatment
According Customer′s Requirement
Operation Pressure
Atmospheric Pressure
Material
According Customer′s Requirement
Grade
35CrMo AISI 4140 G105
Model
Nov Zp275 375 Rotary Table and Spare Parts for Dri
Size
Nov Zp275 375 Rotary Table and Spare Parts for Dri
Name
Nov Zp275 375 Rotary Table and Spare Parts for Dri
Transport Package
Standard Export Package
Specification
2 3/8 2 7/8 3 1/2
Trademark
SEACO
Origin
Shandon China
HS Code
84314310
Production Capacity
100t

Packaging & Delivery

Package Size
290.00cm * 22.00cm * 190.00cm
Package Gross Weight
2900.000kg

Product Description

Nov Zp275 375 Rotary Table and Spare Parts for Drilling RigsNov Zp275 375 Rotary Table and Spare Parts for Drilling RigsNOV Zp275 375 Rotary Table and spare parts for Drilling Rigs 
API 7K  ZP495 Rotary Table 

Product Description

Specifications

ZP495Rotary Table 
1.ZP175/ZP520/ZP275/ZP375/ZP495 
2.According to API 7K standard 
3.Good quality, prompt delivery

NOV Zp275 375 Rotary Table and spare parts for Drilling Rigs 
Features: 

· Meet the API7K requirements

· Conform to the requirements of industry standard SY/T5531

· The rotary table adopts spiral bevel gear drive ,have higher loading capacity and running smooth,long service life

· The casing is a casing and welding structure which has a better rigidity and high precision

· The gears and bearing adopt splash lubrication,simple and reliable

· The input shaft is a cylinder structure ,convenient to servicing
NOV Zp275 375 Rotary Table and spare parts for Drilling Rigs 

Technical Specification:

Item

Model

ZP175

ZP205

ZP275

ZP375

ZP495

Bore diameter (mm)

444.5

520

698.5

952.5

1257.3

Max. static load (kN)

1350

3150

4500

5850

7250

Max. working torque (Nm)

14000

23000

28000

33000

37000

Max. speed (r/min)

300

300

300

300

300

Gear ratio

3.58

3.22

3.67

3.56

3.93

The distance from RT

1118

1353

1353

1353

1651

centerline to the center line

of sprocket inside teeth (mm)

Overall size

L (mm)

1935

2292

2392

2468

2940

W (mm)

1280

1475

1670

1810

2184

H (mm)

585

668

685

718

813

Weight (kg)

3888

5530

6163

7548

11626

 
Detailed Photos

Nov Zp275 375 Rotary Table and Spare Parts for Drilling RigsNov Zp275 375 Rotary Table and Spare Parts for Drilling RigsNov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs

Nov Zp275 375 Rotary Table and Spare Parts for Drilling Rigs

FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now