• Rigid Casing Stabilizer API 10 D 5-1/2"
  • Rigid Casing Stabilizer API 10 D 5-1/2"
  • Rigid Casing Stabilizer API 10 D 5-1/2"
  • Rigid Casing Stabilizer API 10 D 5-1/2"
  • Rigid Casing Stabilizer API 10 D 5-1/2"
  • Rigid Casing Stabilizer API 10 D 5-1/2"

Rigid Casing Stabilizer API 10 D 5-1/2"

After-sales Service: on Site on Line
Warranty: 12 Months
Certification: ISO 9001:2000, ISO 9001:2008
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Rigid Casing Stabilizer API 10 D 5-1/2" pictures & photos
Rigid Casing Stabilizer API 10 D 5-1/2"
US $60 / Piece
Min. Order: 100 Pieces
Gold Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
tool
Power Source
Hydraulic
Operation Pressure
Atmospheric Pressure
Applicable Medium
Water
Structure
Round
Material
Stainless Steel
After Sales Service
on Site on Line
Transport Package
Wooden Box
Specification
7-1/16", 11", 13-5/8", 20- 3/4", 21 - 1/4"
Trademark
SEACO
Origin
Shandong China
HS Code
8431431000

Packaging & Delivery

Package Size
45.00cm * 20.00cm * 15.00cm
Package Gross Weight
20.000kg

Product Description

Rigid Casing Stabilizer API 10 D 5-1/2"

Product Description

5-1/2" rigid casing centralizer are an integral part of the cementing process. They provide the mechanism that centers the casing in the hole and allows uniform cement flow around the casing to help protect it at all points. Several styles of centralizers are available for matching different well specifications and hole sizes, including turbulence generating designs that help clean the annulus and distribute the cement more evenly and uniformly. All models offer ample clearance for fluid passage and are extra effective in centering the casing, even in highly deviated holes and improve cement flow by reducing the effects of channeling.

5-1/2" rigid casing centralizerconsists of a rigid body, on which machined five spiral blades. There are three or four modified alloy steel, fully heat treated rollers fixed on every spiral blades. The assembly is shown as following fig. Because of rigid body and rolling friction between the rollers and inside of well or casing, the capability of the top wire casing rigid roller centralizer is better than others of all. Recommend to use the tool in deviated holes and horizontal holes.

NO. 

Size (in)

ID(mm)

 Height 

(mm)  

 OD

(mm)

 1

4-1/2"*6" (OD)

  116-118

200

 150-152

2

5-1/2"*8-1/4" (OD)

  142-147

250

 207-210

 3

7"*8-1/4" (OD)

  181-184

 250

 207-210

4

7-5/8"*9-3/8" (OD)

  197-201

 250

 235-238

 5

9-5/8"*12" (OD)

  247-251

  250

300-304

 6

13-3/8"*15-3/4"(OD)

  343-347

 250

 396-400

7

13-3/8"*17-1/4"(OD)

 343-347

 250

435-438

Detailed Photos

Rigid Casing Stabilizer API 10 D 5-1/2"Rigid Casing Stabilizer API 10 D 5-1/2"

Rigid Casing Stabilizer API 10 D 5-1/2"Rigid Casing Stabilizer API 10 D 5-1/2"
Rigid Casing Stabilizer API 10 D 5-1/2"
FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now