After-sales Service: | on Site on Line |
---|---|
Warranty: | 12 Months |
Manufacturing Process: | Forging |
Surface Treatment: | Spray-Paint |
Operation Pressure: | High Pressure |
Material: | High Manganese Steel, Tungsten Carbide |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
API 16A U Type Single Ram Blowout Preventer, BOP
U type Ram BOP
U type Ram BOP, Ram opening pressure opens the rams. Following ram change-out, this pressure closes the bonnets.
The U blowout preventer is designed so that hydraulic pressure opens and closes the rams and provides themeans for quick ram change-out.
Ram closing pressure closes the rams. When the bonnet bolts are removed, closing pressure opens thebonnet. After the bonnet has moved to the fully extended position, the ram is clear of the body. An eyebolt canbe installed in the top of each ram to lift it out of the preventer.
Ram opening pressure opens the rams. Following ram change-out, this pressure closes the bonnets. The rams are pulled outward, near the bonnets, before the bonnets begin moving toward the preventer body. Thisassures that the rams never obstruct the bore or interfere with the pipe in the hole. Hydraulic pressure drawsthe bonnets tightly against the preventer body and the bonnet bolts are reinstalled to hold the bonnets closed.
1) Standard:API16A
2) Bore size:7 1/16-21 1/4"
3) Pressure:2000-15000psi
4) Type: Shaffer type, Cameron type
5) Best Price
API 16A Ram BOP Features:
1) Standard:API16A
2) Bore size: 7 1/16"-26 3/4"
3) Pressure:2000-15000psi
4) Type: Shaffer type, Cameron type
5) Body Styles: single, double, triple
6) Outlets: According to customer needs or standard.
7) End type: API flanged, studded and other types are available.
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |
Suppliers with verified business licenses