Coiled Tubing Unit with 2" for Oilfield

Product Details
Customization: Available
After-sales Service: on Site on Line
Warranty: 12 Months
Gold Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

  • Coiled Tubing Unit with 2" for Oilfield
  • Coiled Tubing Unit with 2" for Oilfield
  • Coiled Tubing Unit with 2" for Oilfield
  • Coiled Tubing Unit with 2" for Oilfield
  • Coiled Tubing Unit with 2" for Oilfield
  • Coiled Tubing Unit with 2" for Oilfield
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • FAQ
Overview

Basic Info.

Model NO.
coiled tubing unit with 2"
Condition
New
Motor
AC Motor
Drill Hole Diameter
250-300mm
Drill Hole Depth
>300m
Bit Type
Diamond Bit
Drilling Way
Compound
Product Name
Coiled Tubing Unit
Technique
Cold Drawn
Surface
Mirror
Material
Stainless Steel 201.304. 316
Trademark
SEACO
Origin
Shangdong China
HS Code
8431431000
Production Capacity
50000 PCS/Year

Product Description

 Coiled tubing unit with 2" for oilfield 
Product Description
  • Customized design and configuration to meet offshore lifting and land transportation; 

  • Quick-in-drum design suitable for small offshore platform lifting;

  • DNV, BV certification, etc. available to meet Zone II applications;  

  • BOP backup system to meet customer requirements in case two BOPs are needed;

  • Skid-in-skid module more suitable for offshore applications;

  • Ports for connecting with the yard spooler and tubing blower designed to extend equipment functions.

Detailed Photos
The unit consists of the trailer, power package, control cabin, tubing reel, hose reel, hydraulic transmission system, control
the system, injector, gooseneck, BOP, and other auxiliary components.
Coiled Tubing Unit with 2" for OilfieldCoiled Tubing Unit with 2" for Oilfield
Coiled Tubing Unit with 2" for Oilfield
Coiled Tubing Unit with 2" for OilfieldCoiled Tubing Unit with 2" for Oilfield
FAQ

 

FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier