• 2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
  • 2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
  • 2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
  • 2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
  • 2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
  • 2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong

2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong

After-sales Service: on Site on Line
Warranty: 12months
Certification: CE, ISO 9001:2000, ISO 9001:2008
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong pictures & photos
2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
US $2,900 / Piece
Min. Order: 1 Piece
Gold Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Product Parameters
  • Company Profile
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Model NO.
SB/C / B / DB Manual Tongs
Standard
API
Surface Treatment
Spray-Paint
Manufacturing Process
Forging
Material
Cast Steel
Processing
Forging
Packing
Box
Name
Wellhead Oilfield Sb/C / B / dB Manual Tongs
Rated Torque
48-90
Transport Package
Standard Export Packing
Specification
2 3/8"-13 3/8“
Trademark
SEACO
Origin
Shandong China
HS Code
84314310

Packaging & Delivery

Package Size
135.00cm * 85.00cm * 42.00cm
Package Gross Weight
300.000kg

Product Description

Oil drilling rig supporting tools, SB/C / B / DB  Manual Tongs with API standard 
Product Description

Manual Tongs C /B/DB Type 

Maunal TOngs are necessary tools applied to make up and break out pipes. Changing lug jaws

and latchsteps can adjust different handling sizes of the tongs.They are designed and manufactured as per APISpec 7K specification for drilling and well servicing equipments.
wellhead oilfield SB/C / B / dB Manual Tongs with API Standard 8c

 

Product Parameters

 

Detail technical Specification:

 

Type C Manual Tongs

No. of Latch Lug Jaws

Short Jaw

Hinge Jaw

Handling O.D

Rated Torque

(mm)

(in)

KN•m

1#

2 3/8-7

-

60-93

2 3/8-3.668

48

2#

73-108

2 7/8-4 1/4

3#

89-133

3 1/2-5 1/4

4#

133-178

5 1/4-7

5#

7 3/8-10 3/4

7-8 5/8

178-219

7-8 5/8

6#

9 5/8-10 3/4

244-273

9 5/8-10 3/4

2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong

Type B Manual Tongs

No. of Latch Lug Jaws

Handling Shoulder

Handling O.D

Rated Torque

(mm)

(in)

KN•m

5a

1

86-105

3 3/8-4 1/8

55

2

105-133

4 1/8-5 1/4

75

5b

1

108-133

4 1/4-5 1/4

2

127-146

5-5 3/4

3

152-171

6- 6 3/4

5c

1

168-187

6 5/8-7 3/8

2

187-203

7 3/8-8

3

216-219

8 1/2-8 5/8

55

5d

1

216-244

8 1/2-9 5/8

2

270-273

10 5/8-10 3 /4

5e3

1

340

13 3/8

2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
 

2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
Company Profile

 

2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
Packaging & Shipping

 

2 3/*-13 3/8" Wellhead Oilfield Sb/C / B / dB Manual Tong
FAQ
FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now