Customization: | Available |
---|---|
After-sales Service: | on Site on Line |
Warranty: | 12 Months |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
6inch 8" Heavy Duty Petroleum Suction & Discharge Hose
Looking for a transfer system that can handle even the most rugged environments? Look no further than our reinforced heavy-duty petroleum suction and discharge hose. This versatile hose boasts superior strength, durability, and temperature resistance to make it the perfect solution for transferring oils, petrol-based products, and refined fuels with peace of mind.
Boasting a Nitrile tube that offers exceptional resistance to oils, petrochemicals, and other petroleum-based products, this hose is perfected by textile reinforcement that bolsters its strength and resilience in high-pressure and heavy-duty environments. In addition, using steel helix, this petroleum suction and discharge hose becomes highly resistant to crush damage and kinking.
Whether you're engaged in offshore oil transfer, tank trucks, oilfield transfer, or oil pumping, our industrial-grade equipment is equipped to handle what you need. It features a high-pressure rating of 150 PSI, allowing the petroleum transfer hose to handle high flow rates smoothly while maintaining an 8-inch inner diameter and 8.9-inch outer diameter that ensures the flow of liquids consistently.
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |