• Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld
  • Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld
  • Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld
  • Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld
  • Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld
  • Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld

Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld

Standard: DIN, ANSI
Material: Stainless Steel
Connection: Male
Samples:
US$ 550/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld pictures & photos
Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld
US $30-50 / Piece
Min. Order: 1 Piece
Gold Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Our Advantages
  • FAQ
Overview

Basic Info.

Model NO.
Fig 206 Fig 1502
Surface Treatment
Galvanized Sheet
Head Type
Round
Size
8′′
Pressure
2000psi
Temperature Range
-29ºC-121ºC
Style
Threaded
Model
Hammer Unions 8"12"16" Fig 206 Male Carbon Steel B
Transport Package
Wooden Case
Specification
FIG 206
Trademark
SEACO
Origin
China
Production Capacity
50000 PCS/Year

Packaging & Delivery

Package Size
11.00cm * 11.00cm * 11.00cm
Package Gross Weight
20.000kg

Product Description

Hammer Unions 8"12"16" Fig 206 Male Carbon Steel Buttweld

 

Product Description

 

Hammer Unions can be used for cementing trucks, oil field applications, for quick connection on tank trucks and rail cars carrying of LPG, LNG, CNG, etc., all kinds of manifolds and other high pressure equipment and pipes. Hammer Unions have good mechanical performance and sealing property. Especially, they can operate under the bad weather condition. They can be assembled, fixed and changed easily and conveniently. They are very easy to use as they are self-aligning, and do not require any special tools. It takes some seconds as compared to several minutes required with flanged connection. Hence in case of railway wagon loading, where large numbers of connections are to be made in each loading operation.

Main Types:

Hammer Union type mainly consists of Figure50, Figure100, Figure200, Figure206, Figure207, Figure400, Figure600, Figure602, Figure1002, Figure1002 and Figure1502.

Hammer Unions 8"12"16" Fig 206 Male Carbon Steel Buttweld
Fig 206.

These hammer unions have an additional 'O' ring on the spherical surface of the male sub providing a leak proof seal. All dimensions of Fig200 & Fig206 are identical.
 

Detailed Photos

 

Product Photo:
Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel ButtweldHammer Unions 2"8"12"16" Fig 206 Male Carbon Steel ButtweldHammer Unions 2"8"12"16" Fig 206 Male Carbon Steel ButtweldHammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld

Product Parameters

 


Hammer Unions 2"8"12"16" Fig 206 Male Carbon Steel ButtweldHammer Unions 2"8"12"16" Fig 206 Male Carbon Steel Buttweld

Production

Raw Material:  

Low Carbon Steel (EN 1A, SAE 1020, SAE 1010 etc.)
Medium Carbon Steel (EN 8, EN 31, EN 9, SAE 1045 etc.)
Stainless Steel (SS304, SS310, SS316 etc.)

Factory Workshop: 

Billet-cutting-forging-heating-lathe-drilling-inspection-marking-packing-exporting-union.

 

Our Advantages

 

Advantage

1). ADVANCED PRODUCTION EQUIPMENT
2). ISO 14000 / ISO 9000 / QUALITY CERTIFICATE
3). STRICT QUALITY CONTROL, STRONG R&D TEAM
4). ENVIRONMENTAL FRIENDLY WITHOUT POLLUTION
5). 10 YEARS MANUFACTURING EXPERIENCE, STRONG TEAM

FAQ

 


 

FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now