• Mud Pump Liner/ Cylinder Liner
  • Mud Pump Liner/ Cylinder Liner
  • Mud Pump Liner/ Cylinder Liner
  • Mud Pump Liner/ Cylinder Liner
  • Mud Pump Liner/ Cylinder Liner
  • Mud Pump Liner/ Cylinder Liner

Mud Pump Liner/ Cylinder Liner

After-sales Service: on Site on Line
Warranty: 12 Months
Manufacturing Process: Forging
Samples:
US$ 19/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Mud Pump Liner/ Cylinder Liner pictures & photos
Mud Pump Liner/ Cylinder Liner
US $19 / Piece
Min. Order: 1 Piece
Gold Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Multi-language Pioneer
2 languages freely used by foreign trade staff. include: English, Russian
In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (14)
  • Overview
  • Product Description
  • Detailed Photos
Overview

Basic Info.

Model NO.
API-7K
Surface Treatment
According Customer′s Requirement
Operation Pressure
Atmospheric Pressure
Material
According Customer′s Requirement
Specification
11*10*10
Trademark
SEACO
Origin
China
Production Capacity
20000 Pieces/Year

Packaging & Delivery

Package Size
56.00cm * 40.00cm * 19.00cm
Package Gross Weight
17.000kg

Product Description

Product Description

Composed of a pressure-bearing metal jacket (45# steel) and a highly wear-resistant ceramic lining, combined with precision machining and assembly, the overall mechanical performance is superior, and it is more resistant to corrosion, high temperature, high pressure, labor costs, and maintenance costs. Lower than the bimetal cylinder liner can be inserted, more than 4000 hours, the overall cost is reduced.

 we could supply all spec premium liners and ceramic liners,API 7 EMSCO FB 1300/1600 MUD PUMP  Zirconia  liner used in various brands of mud pumps,produced under API 7.

 

   1)Our API 7  mud pump liner for emsco  are made of a forged steel outer shell and a high chromium iron inner sleeve. The out shell is centrifugally forged with high quality carbon steel, with Tensile Strength  exceed 610Mpa, Yield Strength exceed 450 Mpa, Elongation exceed 17%, Hardness HB -180-200; The inner sleeve is centrifugally forged with high chrome iron alloy, with Hardness over HRC62 after heat treatment. Each API 7  mud pump liner for emsco is machined to close tolerances to assure ease of installation and long liner life with the inside diameter of these premium liners honed to a mirror-like finish for smooth even wear during the life of the liner. It could serve more than 800 hours.

 

  2)Our API 7 EMSCO FB 1300/1600 MUD PUMP  Zirconia  liner  are made of a forged steel outer shell and a ceramic inner sleeve. We can supply Zirconia(ZrO3) sleeves as well as Alumina(Al2O3) sleeves. The ceramic liners are mainly used for well drilling and geological explorations especially widely used in harsh oil mining environment, offshore well&gas exploration etc. It serves a 5 to 10 times longer life than metal products, and will cut down the mining cost of more than 50%.

 

   We could offer the normal export package, and also will customize the package according to customer's requirement so as to meet customer ideal need. 

 

Detailed Photos

Mud Pump Liner/ Cylinder LinerMud Pump Liner/ Cylinder Liner

Mud Pump Liner/ Cylinder Liner
FAQ
Q: How can I place order?
A:You can contact us by email  about your order details, or place order on line
Q: How can l pay you?
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal,
Western Union are the most usual ways we are using
Q: What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an
Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
Q:How do you take care when your clients received defective products?
A:replacement. If there are some defective items, we usually credit to our customer
or replace in next shipment.
Q: How do you check all the goods in the production line?
A:We have spot inspection and finished product inspection.
We check the goods when they go into next step production procedure.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now