Customization: | Available |
---|---|
Manufacturing Process: | CNC Milling |
Surface Treatment: | Without Processing |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Type MP R WA-C API 7K 2 3/8" - 20" Rig Safety Clamp
Oilfield 2 3/8" - 20" Safety Clamp Type MP R MP M API7K
Type MP R WA-C API 7K 2 3/8" - 20" Rig Safety Clamp
Main features of Safety Clamp Type MP:
Safety Clamp Type MP are necessary tools for handling drill collars, flush joint pipes and small shoulder pipes.
They could adjust pipes of different sizes by changing the quantity of chain links.
They are designed and manufactured according to API Spec 7K. Specification for drilling and well servicing equipment.
Type MP R WA-C API 7K 2 3/8" - 20" Rig Safety Clamp
Oilfield 2 3/8" - 20" Safety Clamp Type MP R MP M API7K
The main technical performance and specification for the safety clamp type MP:
Model |
Size Range(in) |
Total Number of Links |
MP-S |
2 7/8-4 1/8 4-5 |
7 8 |
MP-R |
4 1/2-5 5/8 |
7 |
5 1/2-7 |
8 |
|
6 3/4-8 1/4 |
9 |
|
8-9 1/4 |
10 |
|
9 1/4-10 1/2 |
11 |
|
MP-M |
10 1/2-11 1/2 |
12 |
11 1/2-12 1/2 |
13 |
|
12 1/2-13 5/8 |
14 |
|
13 5/8-14 3/4 |
15 |
|
14 3/4-15 7/8 |
16 |
|
MP-L |
15 7/8-17 |
17 |
17-18 1/8 |
18 |
|
18 1/8-19 3/8 |
19 |
|
MP-XL |
19 3/8-20 3/8 |
19 |
20 3/8-20 1/2 |
20 |
|
21-22 5/8 |
21 |
|
22 5/8-23 3/4 |
22 |
|
23 3/4-24 7/8 |
23 |
|
24 7/8-26 |
24 |
|
26-27 1/8 |
25 |
|
29 3/8-30 1/2 |
28 |
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |