After-sales Service: | on Site on Line |
---|---|
Warranty: | 12 Months |
Manufacturing Process: | Forging |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Oil well drilling equipment drill pipe manual tongs
Description for Chinese best sell casing drilling oil rig tongs with model Q340-915/35,Q340/8( Casing Tongs) .They designed for making up or breaking connections of tubular goods, and can handle the pipe sizes from 13 -3/8 in to 36in by replacing interchangeable lug jaw or the step of lug jaw, torque of this type is 35kN.m and 8kN.m.
Casing tongs body is connected with joint pin on the boom and hang over the well rigs through the top ring on the boom.Try to keep the tongs body in horizontal level by adjusting the balance head and adjustable square head screw. The pipe threads cold be tightened or removed as soon as the steel wire rope which is fastened on the tongs line pip has been pulled firmly after the latch and the lug jaw have been looped and the pipes have been held by the tongs head.
FAQ |
Q: How can I place order? |
A:You can contact us by email about your order details, or place order on line |
Q: How can l pay you? |
A:After you confrm our Pl, we will request you to pay.T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using |
Q: What's the order procedure? |
A: First we discuss order details, production details by email or TM. Then we issue you an Pl for your confirmation.You will be requested to do prepaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25 days if we don't have the items in stock. Before production has been fnished,we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you. |
Q:How do you take care when your clients received defective products? |
A:replacement. If there are some defective items, we usually credit to our customer or replace in next shipment. |
Q: How do you check all the goods in the production line? |
A:We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure. |
Suppliers with verified business licenses